Telegraph Canyon Creek Chula Vista Flood Control PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Telegraph Canyon Creek Chula Vista Flood Control PDF full book. Access full book title Telegraph Canyon Creek Chula Vista Flood Control.

Telegraph Canyon Creek, City of Chula Vista, San Diego County, California. Detailed Report for Flood Control. Volume 1. Main Report

Telegraph Canyon Creek, City of Chula Vista, San Diego County, California. Detailed Report for Flood Control. Volume 1. Main Report
Author: ARMY ENGINEER DISTRICT LOS ANGELES CA.
Publisher:
Total Pages: 161
Release: 1983
Genre:
ISBN:

Download Telegraph Canyon Creek, City of Chula Vista, San Diego County, California. Detailed Report for Flood Control. Volume 1. Main Report Book in PDF, ePub and Kindle

Telegraph Canyon Creek Basin is an elongated drainage area comprising about 4,800 acres, or 7.5 square miles, in San Diego County. It is located about 8 miles south of the City San Diego. The creek flows through unincorporated County territory and the City of Chula Vista. Because of the serious potential flood hazard to a highly developed area, the County of San Diego and the City of Chula Vista have sought aid to provide improvements along Telegraph Canyon Creek to protect the area. The selected plan would consit of (1) a 0.7 mile-long rectangular concrete-lined channel from a point about 500 feet upstream from 4th Avenue (near 3rd Avenue) to 0.3- miles upstream from Interstate 5; (2) a 0.3-mile-long section comprising double 10x12-foot boxes of covered channel connecting the rectangular channel to the existing 0.2-mile culvert under Interstate 5, which would be incorporated into the project; (3) a 0.3-mile-long concrete trapezoidal channel downstream from Interstate 5; and (4) a 0.1 mile-long earth-bottom trapezoidal channel leading into the San Diego Bay. This plan would provide protection from a 100-year flood. In Reach II there would be some bridge modifications and channel clearing. Construction of Reach I improvements is not dependent upon construction in Reach II. The total cost of the selected plan in Reach I including study costs would be $5,390,000 (April 1983 price levels) with annual charges, not including study costs, off $394,000 and annual benefits equal to $430,000. The benefit-cost radio would be 1.1.


Telegraph Canyon Creek, City of Chula Vista, San Diego County, California. Detailed Report for Flood Control. Volume 2. Technical Appendixes

Telegraph Canyon Creek, City of Chula Vista, San Diego County, California. Detailed Report for Flood Control. Volume 2. Technical Appendixes
Author: ARMY ENGINEER DISTRICT LOS ANGELES CA.
Publisher:
Total Pages: 282
Release: 1983
Genre:
ISBN:

Download Telegraph Canyon Creek, City of Chula Vista, San Diego County, California. Detailed Report for Flood Control. Volume 2. Technical Appendixes Book in PDF, ePub and Kindle

Contents: Public Views and Responses; Problem Identification (Existing Condition Data); Formulation, Assessment and Evaluation of Detailed Plans; Public Involvement Program; Hydrology; Design and Cost; Recreation and Beautification; Fish and Wildlife; Economics.


Information Brochure

Information Brochure
Author: United States. Army. Corps of Engineers. Los Angeles District
Publisher:
Total Pages: 68
Release: 1975
Genre: Flood control
ISBN:

Download Information Brochure Book in PDF, ePub and Kindle


Energy and water development appropriations for fiscal year 1985

Energy and water development appropriations for fiscal year 1985
Author: United States. Congress. Senate. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
Total Pages: 1510
Release: 1984
Genre: Energy development
ISBN:

Download Energy and water development appropriations for fiscal year 1985 Book in PDF, ePub and Kindle