Susitna Watana Hydroelectric Project Ferc Project No 14241 000 PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Susitna Watana Hydroelectric Project Ferc Project No 14241 000 PDF full book. Access full book title Susitna Watana Hydroelectric Project Ferc Project No 14241 000.
Author | : Sara Fisher-Goad |
Publisher | : |
Total Pages | : 3 |
Release | : 2013 |
Genre | : Dams |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000 Book in PDF, ePub and Kindle
This document is a responce to the Federal Energy Regulatory Commission Staff's December 31, 2012 letter to the Alaska Energy Authority (AEA) regarding the Revised Study Plan for the referenced Project filed by AEA on December 14, 2012. The December 31 letter states that 13 of the 58 study plans lack sufficient detail for the Commission to make a study plan determination. The Staff's letter appears to be based on concerns with the Revised Study Plan identified in a letter filed by the National Marine Fisheries Service dated January 2, 2013. Alaska Energy Authority disagrees with this characterization and addresses each of the matters raised by Staff's December 31 letter in this document.
Author | : Wayne Dyok |
Publisher | : |
Total Pages | : 3 |
Release | : 2013 |
Genre | : Dams |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, Federal Energy Regulatory Commission Project No. 14241-000; Submittal of Information Related to Study Plan Determination Book in PDF, ePub and Kindle
Author | : Sara Fisher-Goad |
Publisher | : |
Total Pages | : 9 |
Release | : 2013 |
Genre | : Dams |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000 Book in PDF, ePub and Kindle
This document is a responce to the Federal Energy Regulatory Commission Staff's December 31, 2012 letter to the Alaska Energy Authority (AEA) regarding the Revised Study Plan for the referenced Project filed by AEA on December 14, 2012. The December 31 letter states that 13 of the 58 study plans lack sufficient detail for the Commission to make a study plan determination. The Staff's letter appears to be based on concerns with the Revised Study Plan identified in a letter filed by the National Marine Fisheries Service dated January 2, 2013. Alaska Energy Authority disagrees with this characterization and addresses each of the matters raised by Staff's December 31 letter in this document.
Author | : Betsy McGregor |
Publisher | : |
Total Pages | : 53 |
Release | : 2013 |
Genre | : Mail surveys |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000; Submission of Final Intercept and Mail Survey Instruments, Recreation Resources Study (RSP 12.5). Book in PDF, ePub and Kindle
Author | : U.S. Fish and Wildlife Service. Anchorage Fish and Wildlife Field Office |
Publisher | : |
Total Pages | : 371 |
Release | : 2016 |
Genre | : Dams |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000 ; Review of Initial Study Reports Book in PDF, ePub and Kindle
This document is the response from the Anchorage Fish and Wildlife Field Office of the U.S. Fish and Wildlife Service regarding the Initial Study Report (ISR) for the proposed Susitna-Watana Hydroelectric Project (FERC No. 14241). The ISR is required by the Federal Energy Regulatory Commission for the licensing of the proposed project. This document comprises a 2-page letter accompanied by five enclosures.
Author | : |
Publisher | : |
Total Pages | : 53 |
Release | : 2013 |
Genre | : Recreational surveys |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000 ; Submission of Final Intercept and Mail Survey Instruments, Recreation Resources Study (RSP 12.5). Book in PDF, ePub and Kindle
Author | : Wayne Dyok |
Publisher | : |
Total Pages | : 3 |
Release | : 2014 |
Genre | : Biological productivity |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000; Second Set of 2014 Technical Memoranda for Initial Study Plan Meetings Book in PDF, ePub and Kindle
This cover letter accompanies seven technical memoranda that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority to the Federal Energy Regulatory Commission as a group filing. These documents all deal with the Susitna River, most of which deals with geomorphology and the rest with beluga whale prey, river productivity, and biotic communities in the river.
Author | : Wayne Dyok |
Publisher | : |
Total Pages | : 2 |
Release | : 2013 |
Genre | : Dams |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, Federal Energy Regulatory Commission Project No. 14241-000; Filing of 2012 Baseline Environmental and Resources Study Reports Book in PDF, ePub and Kindle
Author | : Wayne Dyok |
Publisher | : |
Total Pages | : 3 |
Release | : 2014 |
Genre | : Hydrology |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000; Third Set of 2014 Technical Memoranda for Initial Study Plan Meetings Book in PDF, ePub and Kindle
This cover letter accompanies six technical memoranda that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority to the Federal Energy Regulatory Commission as a group filing. These documents deal with aspects of the Susitna River: water quality, hydrology, salmon, and beluga whales.
Author | : Wayne Dyok |
Publisher | : |
Total Pages | : 4 |
Release | : 2014 |
Genre | : Dams |
ISBN | : |
Download Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000; Filing of Initial Study Plan Meetings Transcripts and Additional Information in Response to October 2014 Initial Study Plan Meetings Book in PDF, ePub and Kindle
This cover letter accompanies fourteen attachments. Six attachments (Attachments A-F) are two-part reports on Initial Study Report (ISR) Meetings--the first part contains the meeting transcripts and the second part contains the agenda and presentations. Eight attachments (Attachments G-N) are technical memoranda that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority to the Federal Energy Regulatory Commission as a group filing. Attachment N consists of errata pages that replace an earlier technical memorandum submitted on September 30, 2014 and that also replace 16 pages for a presentation found in the report for the October 16, 2014 ISR Meeting. This set of documents deal with research being conducted for hydropower development on the Susitna River. The technical memoranda cover fluvial geomorphology, fishery methodology, aquatic habitat mapping, fish passage criteria, and mercury monitoring.