Schultz Hanford Area Transmission Line Project Draft Environmental Impact Statement PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Schultz Hanford Area Transmission Line Project Draft Environmental Impact Statement PDF full book. Access full book title Schultz Hanford Area Transmission Line Project Draft Environmental Impact Statement.

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Download Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Book in PDF, ePub and Kindle

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.