Remedial Investigation Feasibility Study Work Plan For The 100 Fr 3 Operable Unit Hanford Site Richland Washington PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Remedial Investigation Feasibility Study Work Plan For The 100 Fr 3 Operable Unit Hanford Site Richland Washington PDF full book. Access full book title Remedial Investigation Feasibility Study Work Plan For The 100 Fr 3 Operable Unit Hanford Site Richland Washington.

Remedial Investigation/feasibility Study Work Plan for the 100-BC-2 Operable Unit, Hanford Site, Richland, Washington

Remedial Investigation/feasibility Study Work Plan for the 100-BC-2 Operable Unit, Hanford Site, Richland, Washington
Author:
Publisher:
Total Pages: 178
Release: 1993
Genre:
ISBN:

Download Remedial Investigation/feasibility Study Work Plan for the 100-BC-2 Operable Unit, Hanford Site, Richland, Washington Book in PDF, ePub and Kindle

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agencys̀ (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.