Public Transportation New Starts Program Challenges And Preliminary Observations On Expediting Project Development PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Public Transportation New Starts Program Challenges And Preliminary Observations On Expediting Project Development PDF full book. Access full book title Public Transportation New Starts Program Challenges And Preliminary Observations On Expediting Project Development.
Author | : United States Government Accountability Office |
Publisher | : Createspace Independent Publishing Platform |
Total Pages | : 34 |
Release | : 2018-05-18 |
Genre | : |
ISBN | : 9781719267083 |
Download Public Transportation Book in PDF, ePub and Kindle
Public Transportation: New Starts Program Challenges and Preliminary Observations on Expediting Project Development
Author | : A. Nicole Clowers |
Publisher | : DIANE Publishing |
Total Pages | : 20 |
Release | : 2009-12 |
Genre | : Transportation |
ISBN | : 1437917623 |
Download Public Transportation: New Starts Program Challenges and Preliminary Observations on Expediting Project Development Book in PDF, ePub and Kindle
The New Starts program is an important source of new capital investment in mass transportation. The Fed. Transit Admin. (FTA) must prioritize transit projects for funding by evaluating, rating, and recommending projects on the basis of specific financial commitment and project justification criteria, such as cost-effectiveness, economic dev¿t. effects, land use, and environ. benefits. To be eligible for fed. funding, a project must advance through the different project dev¿t. phases of the New Starts program, including alternatives analysis, preliminary engineering, and final design. This testimony discusses the: (1) key challenges associated with the New Starts program; and (2) options that could help expedite project dev¿t. in the New Starts program.
Author | : |
Publisher | : |
Total Pages | : 15 |
Release | : 2009 |
Genre | : Federal aid to transportation |
ISBN | : |
Download Public Transportation Book in PDF, ePub and Kindle
The New Starts program is an important source of new capital investment in mass transportation. As required by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users, the Federal Transit Administration (FTA) must prioritize transit projects for funding by evaluating, rating, and recommending projects on the basis of specific financial commitment and project justification criteria, such as costeffectiveness, economic development effects, land use, and environmental benefits. To be eligible for federal funding, a project must advance through the different project development phases of the New Starts program, including alternatives analysis, preliminary engineering, and final design. Using the statutorily identified criteria, FTA evaluates projects as a condition for advancement into each project development phase of the program. This testimony discusses the (1) key challenges associated with the New Starts program and (2) options that could help expedite project development in the New Starts program. This testimony is based on GAO's extensive body of work on the New Starts program and ongoing work--as directed by Congress. For this work, GAO reviewed FTA documents and interviewed FTA officials, sponsors of New Starts projects, and representatives from industry associations. The FTA reviewed the information in this testimony and provided technical comments.
Author | : Susan A. Fleming |
Publisher | : DIANE Publishing |
Total Pages | : 45 |
Release | : 2010 |
Genre | : Transportation |
ISBN | : 1437920470 |
Download Public Transportation Book in PDF, ePub and Kindle
The New Starts program is an important source of new capital investment in mass transportation. To be eligible for federal funding, a project must advance through the different project development phases of the New Starts program, including alternatives analysis, preliminary engineering, and final design. The Federal Transit Admin. (FTA) evaluates projects as a condition for advancement into each project development phase of the program. FTA has acted recently to streamline the process. This report discusses the: (1) time it has generally taken for projects to move through the New Starts process and what Congress and FTA have done to expedite the process; and (2) options that exist to expedite the process. Tables and graphs.
Author | : United States. Congress. Senate. Committee on Banking, Housing, and Urban Affairs. Subcommittee on Housing, Transportation, and Community Development |
Publisher | : |
Total Pages | : 64 |
Release | : 2009 |
Genre | : Law |
ISBN | : |
Download A Fresh Start for New Starts Book in PDF, ePub and Kindle
Author | : United States Government Accountability Office |
Publisher | : Createspace Independent Publishing Platform |
Total Pages | : 46 |
Release | : 2017-09-08 |
Genre | : |
ISBN | : 9781976202209 |
Download Public Transportation Book in PDF, ePub and Kindle
The New Starts program is an important source of new capital investment in mass transportation. To be eligible for federal funding, a project must advance through the different project development phases of the New Starts program, including alternatives analysis, preliminary engineering, and final design. The Federal Transit Administration (FTA) evaluates projects as a condition for advancement into each project development phase of the program. FTA has acted recently to streamline the process. This report discusses the (1) time it has generally taken for projects to move through the New Starts process and what Congress and FTA have done to expedite the process and (2) options that exist to expedite the process. In response to a legislative mandate, GAO reviewed statutes, FTA guidance and regulations, and project data. GAO also interviewed Department of Transportation (DOT) officials, projects sponsors, and industry stakeholders.
Author | : Calvin B. Lang |
Publisher | : |
Total Pages | : 178 |
Release | : 2009 |
Genre | : Political Science |
ISBN | : |
Download Public Transit Issues and Developments Book in PDF, ePub and Kindle
Through the New Starts program, the Federal Transit Administration (FTA) evaluates and recommends new fixed guideway transit projects for funding using the evaluation criteria identified in law. In August 2007, FTA issued a Notice of Proposed Rulemaking (NPRM), in part, to incorporate certain provisions within the Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU) into the evaluation process. SAFETEA-LU requires the authors to annually review FTA's New Starts process. This book discusses (1) the information captured by New Starts project justification criteria, (2) challenges FTA faces as it works to improve the New Starts program, and (3) options for evaluating New Starts projects. To address these objectives, the authors reviewed statutes, FTA guidance and regulations governing the New Starts program, and interviewed experts, project sponsors, and Department of Transportation (DOT) officials.
Author | : |
Publisher | : DIANE Publishing |
Total Pages | : 62 |
Release | : |
Genre | : |
ISBN | : 1428931856 |
Download Public transportation opportunities exist to improve the communication and transparency of changes made to the New Starts program : report to congressional committees. Book in PDF, ePub and Kindle
Author | : Katherine Siggerud |
Publisher | : DIANE Publishing |
Total Pages | : 67 |
Release | : 2009 |
Genre | : Transportation |
ISBN | : 1437908500 |
Download Public Transportation Book in PDF, ePub and Kindle
Through the New Starts program, the Fed. Transit Admin. (FTA) evaluates and recommends new fixed guideway transit projects for funding using the evaluation criteria identified in law. In Aug. 2007, FTA issued a Notice of Proposed Rulemaking (NPRM), in part, to incorporate certain provisions within the Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU) into the evaluation process. SAFETEA-LU requires an annual review of FTA¿s New Starts process. This report discusses: (1) the information captured by New Starts project justification criteria; (2) challenges FTA faces as it works to improve the New Starts program; and (3) options for evaluating New Starts projects. Includes recommend. Illus.
Author | : U S Government Accountability Office (G |
Publisher | : BiblioGov |
Total Pages | : 48 |
Release | : 2013-06 |
Genre | : |
ISBN | : 9781289042868 |
Download Public Transportation Book in PDF, ePub and Kindle
The U.S. Government Accountability Office (GAO) is an independent agency that works for Congress. The GAO watches over Congress, and investigates how the federal government spends taxpayers dollars. The Comptroller General of the United States is the leader of the GAO, and is appointed to a 15-year term by the U.S. President. The GAO wants to support Congress, while at the same time doing right by the citizens of the United States. They audit, investigate, perform analyses, issue legal decisions and report anything that the government is doing. This is one of their reports.