Project Cost Overrun PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Project Cost Overrun PDF full book. Access full book title Project Cost Overrun.
Author | : Esbjörn Segelod |
Publisher | : Cambridge University Press |
Total Pages | : 273 |
Release | : 2017-11-23 |
Genre | : Business & Economics |
ISBN | : 1107173043 |
Download Project Cost Overrun Book in PDF, ePub and Kindle
This book offers a new way of thinking about the causes and consequences of cost overrun to firms and society. It is ideal for academic researchers in project management, management accounting and corporate finance, as well as for managers in the private and public sectors.
Author | : Bent Flyvbjerg |
Publisher | : Cambridge University Press |
Total Pages | : 226 |
Release | : 2003-02-13 |
Genre | : Business & Economics |
ISBN | : 9780521009461 |
Download Megaprojects and Risk Book in PDF, ePub and Kindle
Megaprojects and Risk provides the first detailed examination of the phenomenon of megaprojects. It is a fascinating account of how the promoters of multi-billion dollar megaprojects systematically and self-servingly misinform parliaments, the public and the media in order to get projects approved and built. It shows, in unusual depth, how the formula for approval is an unhealthy cocktail of underestimated costs, overestimated revenues, undervalued environmental impacts and overvalued economic development effects. This results in projects that are extremely risky, but where the risk is concealed from MPs, taxpayers and investors. The authors not only explore the problems but also suggest practical solutions drawing on theory, experience and hard, scientific evidence from the several hundred projects in twenty nations and five continents that illustrate the book. Accessibly written, it will be the standard reference for students, scholars, planners, economists, auditors, politicians and interested citizens for many years to come.
Author | : Claire Bordat |
Publisher | : |
Total Pages | : |
Release | : 2004-12-15 |
Genre | : |
ISBN | : 9781622602018 |
Download An Analysis of Cost Overruns and Time Delays of INDOT Projects Book in PDF, ePub and Kindle
Author | : K. W. Chau |
Publisher | : Springer |
Total Pages | : 1500 |
Release | : 2017-12-18 |
Genre | : Business & Economics |
ISBN | : 9811061904 |
Download Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate Book in PDF, ePub and Kindle
This book presents the proceedings of CRIOCM_2016, 21st International Conference on Advancement of Construction Management and Real Estate, sharing the latest developments in real estate and construction management around the globe. The conference was organized by the Chinese Research Institute of Construction Management (CRIOCM) working in close collaboration with the University of Hong Kong. Written by international academics and professionals, the proceedings discuss the latest achievements, research findings and advances in frontier disciplines in the field of construction management and real estate. Covering a wide range of topics, including building information modelling, big data, geographic information systems, housing policies, management of infrastructure projects, occupational health and safety, real estate finance and economics, urban planning, and sustainability, the discussions provide valuable insights into the implementation of advanced construction project management and the real estate market in China and abroad. The book is an outstanding reference resource for academics and professionals alike.
Author | : Steve Rowlinson |
Publisher | : Routledge |
Total Pages | : 403 |
Release | : 2005-10-09 |
Genre | : Architecture |
ISBN | : 1135805997 |
Download Procurement Systems Book in PDF, ePub and Kindle
Procurement Systems details the whole spectrum of procurement issues in the construction industry, starting with the client /customer and running through managerial, cultural and IT-based issues. The book commences with an overveiw of previous work and a section on selection criteria is provided to enable practitioners to make their choices of procurement form. Importantly, perfromance comparisons of different procurement forms are discussed and the main emphasis of the book is to highlight best practice based on the most up-to-date research. One chapter deals specifically with developmentally orientated procurement issues in NICs (newly industrialised countries), where best practice is assessed from a different set of perspectives. The authors contributing to this book are among the most highly respected and eminent in the field.
Author | : Ted Trauner |
Publisher | : John Wiley & Sons |
Total Pages | : 229 |
Release | : 2022-11-01 |
Genre | : Technology & Engineering |
ISBN | : 1119910803 |
Download Productivity in Construction Projects Book in PDF, ePub and Kindle
PRODUCTIVITY IN CONSTRUCTION PROJECTS From planning/design to post-construction, this valuable guide provides the construction industry the key to understanding the importance of properly tracking and measuring productivity, resulting in increased efficiency and profitability for contractors, subcontractors, owners, civil and construction engineers, and attorneys. Productivity in Construction Projects anticipates and answers the questions of owners, contractors, sub-contractors, and construction professionals to avoid cost overruns in a specific area of work, or when activities are taking more resources to perform than planned. Packed with real-world case studies, Productivity in Construction Projects’ thirteen chapters move beyond the symptoms and provide a remedy. This book provides a comprehensive look at how to: Complete more projects on time and budget, and earn greater profits and future business. Track and analyze productivity on construction projects, and quantify additional costs resulting from productivity losses. Select the right experts and attorneys should litigation or arbitration occur, and employ credible and reliable methods of analysis. Solve problems on the project instead of incurring lengthy and costly litigation or arbitration.
Author | : Sanjay Kumar Shukla |
Publisher | : Springer Nature |
Total Pages | : 700 |
Release | : 2021-04-29 |
Genre | : Science |
ISBN | : 9813369698 |
Download Advances in Geotechnics and Structural Engineering Book in PDF, ePub and Kindle
This book comprises select proceedings of the International Conference on Trends and Recent Advances in Civil Engineering (TRACE 2020). The book focuses on the latest research developments in structural engineering, structural health monitoring, rehabilitation and retrofitting of structures, geotechnical engineering, and earthquake-resistant structures. The contents also cover the latest innovations in building repair and maintenance, and sustainable materials for rehabilitation and retrofitting. The contents of this book are useful for students, researchers, and professionals working in structural engineering and allied areas.
Author | : Barry B. LePatner |
Publisher | : University of Chicago Press |
Total Pages | : 240 |
Release | : 2008-09-15 |
Genre | : Law |
ISBN | : 0226472701 |
Download Broken Buildings, Busted Budgets Book in PDF, ePub and Kindle
Across the nation, construction projects large and small—from hospitals to schools to simple home improvements—are spiraling out of control. Delays and cost overruns have come to seem “normal,” even as they drain our wallets and send our blood pressure skyrocketing. In Broken Buildings, Busted Budgets, prominent construction attorney Barry B. LePatner builds a powerful case for change in America’s sole remaining “mom and pop” industry—an industry that consumes $1.23 trillion and wastes at least $120 billion each year. With three decades of experience representing clients that include eminent architects and engineers, as well as corporations, institutions, and developers, LePatner has firsthand knowledge of the bad management, ineffective supervision, and insufficient investment in technology that plagues the risk-averse construction industry. In an engaging and direct style, he here pinpoints the issues that underlie the industry’s woes while providing practical tips for anyone in the business of building, including advice on the precise language owners should use during contract negotiations. Armed with Broken Buildings, Busted Budgets, everyone involved in the purchase or renovation of a building or any structure—from homeowners seeking to remodel to civic developers embarking on large-scale projects—has the information they need to change this antiquated industry, one project at a time. “LePatner describes what is wrong with the current system and suggests ways that architects can help—by retaking their rightful place as master builders.”—Fred A. Bernstein, Architect Magazine “Every now and then, a major construction project is completed on time and on budget. Everyone is amazed. . . . Barry LePatner thinks this exception should become the rule. . . . A swift kick to the construction industry.”—James R. Hagerty, Wall Street Journal
Author | : Bent Flyvbjerg |
Publisher | : World Bank Publications |
Total Pages | : 32 |
Release | : 2005 |
Genre | : Economic development projects |
ISBN | : |
Download Policy and Planning for Large Infrastructure Projects Book in PDF, ePub and Kindle
Abstract: "This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation is massive cost overruns, benefit shortfalls, and waste. Second, the paper explores the causes of misinformation and finds that political-economic explanations best account for the available evidence: planners and promoters deliberately misrepresent costs, benefits, and risks in order to increase the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important."--World Bank web site.
Author | : Pavel Akimov |
Publisher | : Springer Nature |
Total Pages | : 449 |
Release | : 2021-09-14 |
Genre | : Technology & Engineering |
ISBN | : 3030860019 |
Download XXX Russian-Polish-Slovak Seminar Theoretical Foundation of Civil Engineering (RSP 2021) Book in PDF, ePub and Kindle
This book gathers the latest advances, innovations, and applications in the field of civil, environmental and construction engineering, as presented by researchers and engineers at the XXX Annual Russian-Polish-Slovak Seminar Theoretical Foundation of Civil Engineering (RSP), held in September 2021. Co-organized by six universities from Russia, Poland and Slovakia, the event covered diverse topics such as structural mechanics; building structures; geodesy and geotechnics; transport and environmental issues in civil engineering. The contributions, which were selected by means of a rigorous international peer-review process, highlight numerous exciting ideas that will spur novel research directions and foster multidisciplinary collaborations.