Phase I Archaeological Survey And Geomorphological Investigation For The Winona Bridge Rehabilitation Replacement Project At The City Of Winona Winona County Minnesota PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Phase I Archaeological Survey And Geomorphological Investigation For The Winona Bridge Rehabilitation Replacement Project At The City Of Winona Winona County Minnesota PDF full book. Access full book title Phase I Archaeological Survey And Geomorphological Investigation For The Winona Bridge Rehabilitation Replacement Project At The City Of Winona Winona County Minnesota.

Addendum Report

Addendum Report
Author: Frank Florin
Publisher:
Total Pages:
Release: 2010
Genre:
ISBN:

Download Addendum Report Book in PDF, ePub and Kindle


A Phase 1 Archaeological Survey for Historical Properties Within the Swan Lake, Habitat Rehabilitation Enhancement Project (HREP) Environmental Management Program, (EMP), Pool 26, Illinois River, Calhoun County Illinois

A Phase 1 Archaeological Survey for Historical Properties Within the Swan Lake, Habitat Rehabilitation Enhancement Project (HREP) Environmental Management Program, (EMP), Pool 26, Illinois River, Calhoun County Illinois
Author:
Publisher:
Total Pages: 0
Release: 1995
Genre:
ISBN:

Download A Phase 1 Archaeological Survey for Historical Properties Within the Swan Lake, Habitat Rehabilitation Enhancement Project (HREP) Environmental Management Program, (EMP), Pool 26, Illinois River, Calhoun County Illinois Book in PDF, ePub and Kindle

Report describes results of a Phase I Archaeological & geomorphological investigation of 95 ac. within the Swan Lake Habitat Rehabilitation Enhancement Project (HREP) construction area, located in Pool 26, Illinois River (mile 5.0-13.0, right bank) Calhoun Co. 11. Project involves construction of a levee, 5 borrow areas, 3 pump stations & 2 boat ramps w/ parking lots. Geomorphological investigation found recent alluvium deeper that construction impacts cover much of the area. In some areas where construction will go below the recent alluvium, buried soils were identified and further investigated. Two archaeoloical sites were investigated. Prehistoric (Woodland) Persimmon site (11-C-152 was determined eligible and recommended for mitigation. Buried site 11-C-212 contained prehistoric eligible) & historic (ineligible) components. The prehistoric component will be avoided. Project clearance in regard to cultural resources is recommended. Survey was conducted in October, 1994 by American Resources Group, Lt., for the U.S. ArmCors of Engineers, St. Louis District on Corps lands managed for waterfowl bytell. Dept. of Nat. Resources & the U.S. Fish and Wildlife Service. The HREP is art of the Environmental Management Program (EMP) established to enhance & rehabiitatethe Upper Mississippi River system.


Archaeological Phase IB Survey of the Proposed Orford-Fairlee Bridge Rehabilitation Project, BHF-030-1(13), 12898, Fairlee, Orange County, Vermont and Orford, Grafton County, New Hampshire

Archaeological Phase IB Survey of the Proposed Orford-Fairlee Bridge Rehabilitation Project, BHF-030-1(13), 12898, Fairlee, Orange County, Vermont and Orford, Grafton County, New Hampshire
Author: Hutch M. McPheters
Publisher:
Total Pages: 40
Release: 2001
Genre: Excavations (Archaeology)
ISBN:

Download Archaeological Phase IB Survey of the Proposed Orford-Fairlee Bridge Rehabilitation Project, BHF-030-1(13), 12898, Fairlee, Orange County, Vermont and Orford, Grafton County, New Hampshire Book in PDF, ePub and Kindle