Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Missouri Missouri Grand Chariton Basin Bethany City Reservoir Harrison County Missouri Phase 1 Inspection Report National Dam Safety Program PDF full book. Access full book title Missouri Missouri Grand Chariton Basin Bethany City Reservoir Harrison County Missouri Phase 1 Inspection Report National Dam Safety Program.

National Dam Safety Program. Bethany City Reservoir Dam (MO 10051), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report

National Dam Safety Program. Bethany City Reservoir Dam (MO 10051), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report
Author: Harold P. Hoskins
Publisher:
Total Pages: 42
Release: 1978
Genre:
ISBN:

Download National Dam Safety Program. Bethany City Reservoir Dam (MO 10051), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report Book in PDF, ePub and Kindle

Bethany City Reservoir Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass 25% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. Additional deficiencies, in accordance with the guidelines, are the lack of seepage and stability analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were many small trees and brush growing on both embankment slopes, rodent holes and burrows on the downstream slope, a small crack parallel to and downstream from the centerline of the dam, a bulged area in the embankment downstream from the crack, a boil adjacent to the pumphouse caused by a broken water main and spalling of the concrete in the cap on the spillway.


National Dam Safety Program. Bethany New City Reservoir Dam (MO 10071), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report

National Dam Safety Program. Bethany New City Reservoir Dam (MO 10071), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report
Author: Harold P. Hoskins
Publisher:
Total Pages: 38
Release: 1978
Genre:
ISBN:

Download National Dam Safety Program. Bethany New City Reservoir Dam (MO 10071), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report Book in PDF, ePub and Kindle

Bethany New City Reservoir Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. Additional deficiencies, in accordance with the guidelines, are the lack of seepage and stability analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were small trees and brush growing on the upstream embankment slope, some trees growing in the spillway channel and erosion of the spillway channel downstream from the sill.


National Dam Safety Program. Harrison County Dam C-2 (MO 10614), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report

National Dam Safety Program. Harrison County Dam C-2 (MO 10614), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report
Author: Edwin R. Burton
Publisher:
Total Pages: 59
Release: 1981
Genre:
ISBN:

Download National Dam Safety Program. Harrison County Dam C-2 (MO 10614), Missouri - Grand - Chariton Basin, Harrison County, Missouri. Phase I Inspection Report Book in PDF, ePub and Kindle

This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).


National Dam Safety Program. City of Cameron Reservoir Number 1 Dam (MO 10042), Grand - Chariton Basin, Dekalb County, Missouri. Phase I Inspection Report

National Dam Safety Program. City of Cameron Reservoir Number 1 Dam (MO 10042), Grand - Chariton Basin, Dekalb County, Missouri. Phase I Inspection Report
Author: Paul R. Zaman
Publisher:
Total Pages: 47
Release: 1979
Genre:
ISBN:

Download National Dam Safety Program. City of Cameron Reservoir Number 1 Dam (MO 10042), Grand - Chariton Basin, Dekalb County, Missouri. Phase I Inspection Report Book in PDF, ePub and Kindle

This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).