Management And Data Management Plan For Remedial Investigation At Fort George G Meade Landfill And Preliminary Assessment Site Investigation At The Former Gaithersburg Nike Control And Launch Areas PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Management And Data Management Plan For Remedial Investigation At Fort George G Meade Landfill And Preliminary Assessment Site Investigation At The Former Gaithersburg Nike Control And Launch Areas PDF full book. Access full book title Management And Data Management Plan For Remedial Investigation At Fort George G Meade Landfill And Preliminary Assessment Site Investigation At The Former Gaithersburg Nike Control And Launch Areas.

Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas

Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas
Author:
Publisher:
Total Pages: 76
Release: 1989
Genre:
ISBN:

Download Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas Book in PDF, ePub and Kindle

Work assignments under this contract will include a Preliminary Assessment/Site Investigation at the former Gaithersburg NIKE Control and Launch Areas and a Remedial Investigation at the Fort Meade Landfill and other technical actions to establish the basis for development and evaluation of remedial alternatives. The program requires flexibility in organizing a team of technical personnel and technical resources to meet installation-specific needs, concurrent with employing preapproved field procedures, sampling techniques, and analytical methods to accomplish the assigned effort. At any given time during the period of performance, contamination assessments, sampling and analysis, geo- physical or aquifer testing, and preliminary risk assessments may be in various stages of progress. The effective program organization will accommodate these requirements for both flexibility and consistency while maintaining a manageable degree of control over all activities. Figure 1-1 illustrates the proposed organization for accomplishment of this effort. The core of the technical organization is the Project Manager and the assigned Project Team. Additional individuals can be made available if warranted. The Project Manager assigned to the project has current USATHAMA task management experience and will act as a direct line of technical communication to the COR with a secondary, backup line of communication through the Program Manager.


Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Author:
Publisher:
Total Pages: 68
Release: 1995
Genre:
ISBN:

Download Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland Book in PDF, ePub and Kindle

The purpose of this investigation is to conduct a remedial investigation/feasibility study at the HHA and FTA sites at Fort Meade. As part of the analyses, data gaps will be identified. Previous studies have been conducted by Arthur D. Little, Inc., and EA engineering, Science and Technology, Inc. The RI/FS process is designed to collect sufficient data of demonstrable quality, which can then be used to assess potential risks to human health and the environment, develop/evaluate remedial alternatives, and select a preferred remedial action. In general, data obtained during the RI phase is used to evaluate the nature, extent, and migration of contaminants at sites that are known or believed to have been adversely impacted by past hazardous waste or hazardous materials handling practices. The FS phase evaluates potential remedial action with regard to effectiveness, risk reduction or mitigation, implementability, and cost.


Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Author:
Publisher:
Total Pages: 70
Release: 1995
Genre:
ISBN:

Download Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland Book in PDF, ePub and Kindle

This Work Plan has been prepared to address the Remedial Investigation/ Feasibility Study (RI/FS) activities being conducted at the Helicopter Hangar Area (HHA) and the Fire Training Area (FTA) at Fort George G. Meade (FGGM), Maryland. It has been prepared for the U.S. Army Environmental Center (USAEC) to fulfill the requirements of deliverable ELIN A004 under Delivery Task Orders 0002 and 0003 of Contract DAAA15-93-D-0010. This Work Plan has been developed in accordance with Geotechnical Requirements for Drilling Monitor Wells Data Acquisition and Reports (USATHAMA, 1987); USATHAMA Quality Assurance Plan (USATHAMA, 1990); Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (USEPA, 1988); Risk Assessment Guidance for Superfund. Volumes I and II (USEPA, 1989); Community Relations in Superfund: A Handbook (USEPA, 1988) and Superfund Public Health Evaluation Manual (USEPA, 1986).


Technical and Sampling/Analysis Plan for Fort Meade Base Closure Parcel Site Inspection and Phase II Remedial Investigation Studies

Technical and Sampling/Analysis Plan for Fort Meade Base Closure Parcel Site Inspection and Phase II Remedial Investigation Studies
Author:
Publisher:
Total Pages: 179
Release: 1990
Genre:
ISBN:

Download Technical and Sampling/Analysis Plan for Fort Meade Base Closure Parcel Site Inspection and Phase II Remedial Investigation Studies Book in PDF, ePub and Kindle

This Technical and Sampling/Analysis Plan (T & S/A) supports the environmental studies to be completed by EA Engineering, Science and Technology, Inc. (EA) at specific sites located within the area identified for Base Closure at Fort Meade, Maryland. EA is conducting this work for the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA) under Contract No. DAAAl5-88-D-0005, Modification 000102. This Plan in conjunction with separate Safety and Health, Resource and Data Management, and Quality Assurance Plans form the framework upon which this project will be conducted. Fort Meade has been a permanent U.S. Army installation since 1917. It is located on approximately 13,000 acres in northwestern Anne Arundel County, Maryland. In December, 1988, the Secretary of Defense's Commission issued a Base Closure and Realignment and this report identified 9,000 acres for closure and realignment. Fort Meade is situated almost equidistant between Baltimore, Maryland and Washington, D.C. (Figure 1-1). Figure 1-2 is a map of the Fort Meade area and can be found in the back pocket of this plan. This figure shows the division between the Cantonment area and the land identified for closure plus the relative locations of- the sites to be studied during this project. The Cantonment area, which occupies the northernmost one-third of the installation contains administrative, recreational and housing facilities. The Base Closure Parcel (BCP) encompasses the southernmost two-thirds of the installation. This area is largely wooded and contains the active sanitary landfill, an inactive clean fill dump, three inactive sanitary/rubble fill areas, Tipton Airfield, numerous underground storage tank sites, four water supply wells and associated distribution system. Vast land areas are used for training troops. Virtually all of the BCP has been used as range and impact areas over the years. An additional.


Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12

Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12
Author:
Publisher:
Total Pages: 1148
Release: 1993
Genre:
ISBN:

Download Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12 Book in PDF, ePub and Kindle

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).


Waste Management Plan for the Oak Ridge National Remedial Investigation/Feasibility Study

Waste Management Plan for the Oak Ridge National Remedial Investigation/Feasibility Study
Author:
Publisher:
Total Pages: 144
Release: 1988
Genre:
ISBN:

Download Waste Management Plan for the Oak Ridge National Remedial Investigation/Feasibility Study Book in PDF, ePub and Kindle

In accordance with the requirements of the Remedial Investigation/Feasibility Study (RI/FS) Project Quality Assurance Plan, this Waste Management Plan establishes clear lines of responsibility and authority, documentation requirements, and operational guidance for the collection, identification, segregation, classification, packaging, certification, and storage/disposal of wastes. These subjects are discussed in the subsequent sections of this document.


Waste Management Plan for the Oak Ridge National Remedial Investigation

Waste Management Plan for the Oak Ridge National Remedial Investigation
Author:
Publisher:
Total Pages: 144
Release: 1988
Genre:
ISBN:

Download Waste Management Plan for the Oak Ridge National Remedial Investigation Book in PDF, ePub and Kindle

In accordance with the requirements of the Remedial Investigation/Feasibility Study (RI/FS) Project Quality Assurance Plan, this Waste Management Plan establishes clear lines of responsibility and authority, documentation requirements, and operational guidance for the collection, identification, segregation, classification, packaging, certification, and storage/disposal of wastes. These subjects are discussed in the subsequent sections of this document.