Little River Inlet Navigation Proj Brunswick Cty Nc Horry Cty Sc Rev Statement Army Corps Eng Charleston Sc PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Little River Inlet Navigation Proj Brunswick Cty Nc Horry Cty Sc Rev Statement Army Corps Eng Charleston Sc PDF full book. Access full book title Little River Inlet Navigation Proj Brunswick Cty Nc Horry Cty Sc Rev Statement Army Corps Eng Charleston Sc.

Little River Inlet Navigation Project, Brunswick County, North Carolina and Horry County, South Carolina. Revision

Little River Inlet Navigation Project, Brunswick County, North Carolina and Horry County, South Carolina. Revision
Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
Total Pages: 145
Release: 1977
Genre:
ISBN:

Download Little River Inlet Navigation Project, Brunswick County, North Carolina and Horry County, South Carolina. Revision Book in PDF, ePub and Kindle

The recommended plan of improvement consists of the following: dredging an entrance channel, 300 feet wide and 12 feet deep through the offshore bar, a distance of approximately 5,160 feet; providing an inner channel, 90 feet wide and 10 feet deep from the entrance channel to the Atlantic Intracoastal Waterway, a distance of 11,000 feet; dredging the lower 5,200 feet of the inner channel; dredging an upcoast deposition basin adjacent to the weir section of the north jetty to a depth of -20 feet to provide a capacity of 200,000 cubic yards; constructing a north jetty 3,385 feet long with a low weir section for sand bypassing; constructing sand dikes on both sides of the inlet to tie the jetties to the existng dune line; and possibly constructing a fishing walkway on top of the south jetty. The adverse environmental effects will be temporary increase in turbidity; alteration of existing vegetation during construction of south sand dike; temporary disturbance of birds and mammals in the area; destruction of some benthic organisms by dredge cutterhead; smothering of invertebrates under jetty stone and in beach disposal area; and possible displacement of wildlife species.


Little River Navigation Project, Horry County, South Carolina and Brunswick County, North Carolina. Revision of Weir System and Jetty Sections. Supplement 1

Little River Navigation Project, Horry County, South Carolina and Brunswick County, North Carolina. Revision of Weir System and Jetty Sections. Supplement 1
Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
Total Pages: 47
Release: 1978
Genre:
ISBN:

Download Little River Navigation Project, Horry County, South Carolina and Brunswick County, North Carolina. Revision of Weir System and Jetty Sections. Supplement 1 Book in PDF, ePub and Kindle

This supplement presents detailed descriptions, a revised cost estimate and updated benefits reflecting modifications to the channels, jetties, and weir system that had previously been approved in the General Design Memorandum. The proposed plan in this supplement provides for the construction of an upcoast and downcoast jetty, an upcoast and downcoast 650' weir section, two sand dikes, two deposition basins, an inner channel, and a 45 deg flared entrance channel. The proposed plan has the same general alignment as the GDM Plan, but incorporates some significant design improvements.


EIS Annual Review

EIS Annual Review
Author:
Publisher:
Total Pages: 424
Release: 1978
Genre: Environmental impact statements
ISBN:

Download EIS Annual Review Book in PDF, ePub and Kindle