Impact Of Savannah Harbor Deep Draft Navigation Project On Tybee Island Shelf And Shoreline PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Impact Of Savannah Harbor Deep Draft Navigation Project On Tybee Island Shelf And Shoreline PDF full book. Access full book title Impact Of Savannah Harbor Deep Draft Navigation Project On Tybee Island Shelf And Shoreline.

Section 111 Report

Section 111 Report
Author: United States. Army. Corps of Engineers. Savannah District. South Atlantic Division
Publisher:
Total Pages:
Release: 2000
Genre: Beach erosion
ISBN:

Download Section 111 Report Book in PDF, ePub and Kindle


Ship Forces on the Shoreline of the Savannah Harbor Project

Ship Forces on the Shoreline of the Savannah Harbor Project
Author:
Publisher:
Total Pages: 150
Release: 2007
Genre:
ISBN:

Download Ship Forces on the Shoreline of the Savannah Harbor Project Book in PDF, ePub and Kindle

Ship forces having the potential to cause shoreline erosion were evaluated at Savannah Harbor to compare the without-project (existing) and the with-project (deepened) channels. Comparable ship speeds were determined in the without-project and with-project channels based on field data and an analytical model. Four traffic alternatives were evaluated that primarily differ in the number of post-Panamax ships compared to Panamax ships. At Fort Pulaski, dominant ship effects include short period bow and stern waves and long period drawdown and return velocity. The composite return velocity and drawdown per ship are 3.2 to 6.2 percent less in the with-project channel. Due to the slightly higher speed in the with-project channel, short period bow and stern waves are the shoreline attack force that increases in the with-project channel at Fort Pulaski. The composite short period bow and stern wave height per ship for years 2030 and 2050 is predicted to be 1.5 to 4.4 percent greater in the deepened channel. At Tybee Island, the only significant ship effect reaching the shoreline is the long period drawdown or pressure wave. The composite drawdown in the channel between the jetties per ship is 2.3 to 5.9 percent less in the with-project channel.