Hydrogen Energy California Project PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Hydrogen Energy California Project PDF full book. Access full book title Hydrogen Energy California Project.

Hydrogen Energy California Project: Sections 4.9-9

Hydrogen Energy California Project: Sections 4.9-9
Author: California Energy Commission
Publisher:
Total Pages: 808
Release: 2013
Genre: Coal gasification
ISBN:

Download Hydrogen Energy California Project: Sections 4.9-9 Book in PDF, ePub and Kindle

"This project is for an integrated gasification combined cycle (IGCC) power generating facility called Hydrogen Energy California (HECA) in Kern County, California.... The project, as proposed, would gasify blends of petroleum coke (25 %) and coal (75%) to produce hydrogen to fuel a combustion turbine operating in combined cycle mode. The gasification component would produce 180 million standard cubic feet per day (MMSCFD) of hydrogen to feed a 400 megawatt (MW) gross, 288 MW net combined cycle plant providing California with dispatchable baseload power to the grid. The gasification component would also capture approximately 130 MMSCFD of carbon dioxide (or approximately 90 percent at steady-state operation) which would be transported and used for enhanced oil recovery and sequestration (storage) in the Elk Hills Oil Field Unit. The HECA project would also produce approximately 1 million tons of fertilizer for domestic use" --California Energy Commission web site, Docket 08-AFC-8A.


Hydrogen Energy California Project: Sections 4.3-4.8

Hydrogen Energy California Project: Sections 4.3-4.8
Author: California Energy Commission
Publisher:
Total Pages: 706
Release: 2013
Genre: Coal gasification
ISBN:

Download Hydrogen Energy California Project: Sections 4.3-4.8 Book in PDF, ePub and Kindle

"This project is for an integrated gasification combined cycle (IGCC) power generating facility called Hydrogen Energy California (HECA) in Kern County, California.... The project, as proposed, would gasify blends of petroleum coke (25 %) and coal (75%) to produce hydrogen to fuel a combustion turbine operating in combined cycle mode. The gasification component would produce 180 million standard cubic feet per day (MMSCFD) of hydrogen to feed a 400 megawatt (MW) gross, 288 MW net combined cycle plant providing California with dispatchable baseload power to the grid. The gasification component would also capture approximately 130 MMSCFD of carbon dioxide (or approximately 90 percent at steady-state operation) which would be transported and used for enhanced oil recovery and sequestration (storage) in the Elk Hills Oil Field Unit. The HECA project would also produce approximately 1 million tons of fertilizer for domestic use" --California Energy Commission web site, Docket 08-AFC-8A.


Hydrogen Energy California Project: Sections 1-4.2

Hydrogen Energy California Project: Sections 1-4.2
Author: California Energy Commission
Publisher:
Total Pages: 790
Release: 2013
Genre: Coal gasification
ISBN:

Download Hydrogen Energy California Project: Sections 1-4.2 Book in PDF, ePub and Kindle

"This project is for an integrated gasification combined cycle (IGCC) power generating facility called Hydrogen Energy California (HECA) in Kern County, California.... The project, as proposed, would gasify blends of petroleum coke (25 %) and coal (75%) to produce hydrogen to fuel a combustion turbine operating in combined cycle mode. The gasification component would produce 180 million standard cubic feet per day (MMSCFD) of hydrogen to feed a 400 megawatt (MW) gross, 288 MW net combined cycle plant providing California with dispatchable baseload power to the grid. The gasification component would also capture approximately 130 MMSCFD of carbon dioxide (or approximately 90 percent at steady-state operation) which would be transported and used for enhanced oil recovery and sequestration (storage) in the Elk Hills Oil Field Unit. The HECA project would also produce approximately 1 million tons of fertilizer for domestic use" --California Energy Commission web site, Docket 08-AFC-8A.


Hydrogen Energy California Project

Hydrogen Energy California Project
Author: California Energy Commission
Publisher:
Total Pages:
Release: 2013
Genre: Coal gasification
ISBN:

Download Hydrogen Energy California Project Book in PDF, ePub and Kindle

"This project is for an integrated gasification combined cycle (IGCC) power generating facility called Hydrogen Energy California (HECA) in Kern County, California.... The project, as proposed, would gasify blends of petroleum coke (25 %) and coal (75%) to produce hydrogen to fuel a combustion turbine operating in combined cycle mode. The gasification component would produce 180 million standard cubic feet per day (MMSCFD) of hydrogen to feed a 400 megawatt (MW) gross, 288 MW net combined cycle plant providing California with dispatchable baseload power to the grid. The gasification component would also capture approximately 130 MMSCFD of carbon dioxide (or approximately 90 percent at steady-state operation) which would be transported and used for enhanced oil recovery and sequestration (storage) in the Elk Hills Oil Field Unit. The HECA project would also produce approximately 1 million tons of fertilizer for domestic use" --California Energy Commission web site, Docket 08-AFC-8A.


Hydrogen Energy California Project

Hydrogen Energy California Project
Author: California Energy Commission
Publisher:
Total Pages:
Release: 2010
Genre: Combined cycle power plants
ISBN:

Download Hydrogen Energy California Project Book in PDF, ePub and Kindle


California Hydrogen Infrastructure Project

California Hydrogen Infrastructure Project
Author:
Publisher:
Total Pages:
Release: 2013
Genre:
ISBN:

Download California Hydrogen Infrastructure Project Book in PDF, ePub and Kindle

Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user's fueling experience.