Duane Arnold Energy Center Modifications And Additions Environmental Assessment Ea Finding Of No Significant Impact Fonsi PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Duane Arnold Energy Center Modifications And Additions Environmental Assessment Ea Finding Of No Significant Impact Fonsi PDF full book. Access full book title Duane Arnold Energy Center Modifications And Additions Environmental Assessment Ea Finding Of No Significant Impact Fonsi.
Author | : |
Publisher | : |
Total Pages | : 24 |
Release | : 1980 |
Genre | : |
ISBN | : |
Download Duane Arnold Energy Center Modifications and Additions, Environmental Assessment (EA), Finding of No Significant Impact (FONSI). Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 0 |
Release | : 1980 |
Genre | : |
ISBN | : |
Download Duane Arnold Energy Center modifications and additions, environmental assessment Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 98 |
Release | : 1973 |
Genre | : |
ISBN | : |
Download Duane Arnold Energy Center,operation Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 60 |
Release | : 1995 |
Genre | : |
ISBN | : |
Download Environmental Assessment for the Proposed Modification and Continued Operation of the DIII-D Facility Book in PDF, ePub and Kindle
The EA evaluates the proposed action of modifying the DIII-D fusion facility and conducting related research activities at the GA San Diego site over 1995-1999 under DOE contract number DE-ACO3-89ER51114. The proposed action is need to advance magnetic fusion research for future generation fusion devices such as ITER and TPX. It was determined that the proposed action is not a major action significantly affecting the quality of the human environment according to NEPA; therefore a finding of no significant impact is made and an environmental impact statement is not required.
Author | : Michael L. Hammersley |
Publisher | : |
Total Pages | : 10 |
Release | : 1991 |
Genre | : Campus planning |
ISBN | : |
Download Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for Student Activities Center Appalachian State University Boone, NC Code 48730 Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 20 |
Release | : 1982 |
Genre | : |
ISBN | : |
Download Thomas Hill Unit No.1 Precipitator Retrofit, Randolph County, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI). Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 36 |
Release | : 1997 |
Genre | : |
ISBN | : |
Download Environmental Assessment -- Test Area North Pool Stabilization Project Update Book in PDF, ePub and Kindle
The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.
Author | : |
Publisher | : |
Total Pages | : 43 |
Release | : 1997 |
Genre | : |
ISBN | : |
Download Draft Environmental Assessment -- Test Area North Pool Stabilization Project Update Book in PDF, ePub and Kindle
The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.
Author | : |
Publisher | : |
Total Pages | : 36 |
Release | : 1983 |
Genre | : |
ISBN | : |
Download New 46 and 115 KV Transmission Facilities (AL,FL), Environmental Assessment (EA)-Finding of No Significant Impact (FONSI). Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 88 |
Release | : 1995 |
Genre | : |
ISBN | : |
Download Finding of No Significant Impact Proposed Corrective Action for the Northeast Site at the Pinellas Plant in Largo, Florida Book in PDF, ePub and Kindle
The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).