Construct A New Alignment For State Route 58 To Provide A Continuous Route Along State Route 58 From Cottonwood Road Post Mile R556 On Existing State Route 58 East East Of State Route 99 To Interstate 5 Post Mile T317 Improve State Route 99 From Wilson Road Post Mile 212 To Gilmore Avenue Post Mile 262 B Final Environmental Impact Report Environmental Impact Statement And Section 4f Evaluation PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Construct A New Alignment For State Route 58 To Provide A Continuous Route Along State Route 58 From Cottonwood Road Post Mile R556 On Existing State Route 58 East East Of State Route 99 To Interstate 5 Post Mile T317 Improve State Route 99 From Wilson Road Post Mile 212 To Gilmore Avenue Post Mile 262 B Final Environmental Impact Report Environmental Impact Statement And Section 4f Evaluation PDF full book. Access full book title Construct A New Alignment For State Route 58 To Provide A Continuous Route Along State Route 58 From Cottonwood Road Post Mile R556 On Existing State Route 58 East East Of State Route 99 To Interstate 5 Post Mile T317 Improve State Route 99 From Wilson Road Post Mile 212 To Gilmore Avenue Post Mile 262 B Final Environmental Impact Report Environmental Impact Statement And Section 4f Evaluation.

Construct a New Alignment for State Route 58 to Provide a Continuous Route Along State Route 58 from Cottonwood Road (post Mile R55.6) on Existing State Route 58 (East), East of State Route 99 to Interstate 5 (post Mile T31.7); Improve State Route 99 from Wilson Road (post Mile) 21.2) to Gilmore Avenue (post Mile 26.2) : ‡b Final Environmental Impact Report/environmental Impact Statement and Section 4(f) Evaluation

Construct a New Alignment for State Route 58 to Provide a Continuous Route Along State Route 58 from Cottonwood Road (post Mile R55.6) on Existing State Route 58 (East), East of State Route 99 to Interstate 5 (post Mile T31.7); Improve State Route 99 from Wilson Road (post Mile) 21.2) to Gilmore Avenue (post Mile 26.2) : ‡b Final Environmental Impact Report/environmental Impact Statement and Section 4(f) Evaluation
Author:
Publisher:
Total Pages:
Release: 2015
Genre:
ISBN:

Download Construct a New Alignment for State Route 58 to Provide a Continuous Route Along State Route 58 from Cottonwood Road (post Mile R55.6) on Existing State Route 58 (East), East of State Route 99 to Interstate 5 (post Mile T31.7); Improve State Route 99 from Wilson Road (post Mile) 21.2) to Gilmore Avenue (post Mile 26.2) : ‡b Final Environmental Impact Report/environmental Impact Statement and Section 4(f) Evaluation Book in PDF, ePub and Kindle


Construct a New Interchange, Grade Separate, Widen, and Realign a 13.3-mile Segment of State Route 58 (SR-58), 0.4 Miles West of the Kern County/San Bernardino County Line (PM 0.0) to Approximately Or 7.5 Miles East of United States Route 395 (US-395) (PM 12.9) in the Mojave Desert Region of Western San Bernadino County

Construct a New Interchange, Grade Separate, Widen, and Realign a 13.3-mile Segment of State Route 58 (SR-58), 0.4 Miles West of the Kern County/San Bernardino County Line (PM 0.0) to Approximately Or 7.5 Miles East of United States Route 395 (US-395) (PM 12.9) in the Mojave Desert Region of Western San Bernadino County
Author: United States. Federal Highway Administration
Publisher:
Total Pages:
Release: 2013
Genre:
ISBN:

Download Construct a New Interchange, Grade Separate, Widen, and Realign a 13.3-mile Segment of State Route 58 (SR-58), 0.4 Miles West of the Kern County/San Bernardino County Line (PM 0.0) to Approximately Or 7.5 Miles East of United States Route 395 (US-395) (PM 12.9) in the Mojave Desert Region of Western San Bernadino County Book in PDF, ePub and Kindle


State Route 116 - Stage Gulch Road

State Route 116 - Stage Gulch Road
Author:
Publisher:
Total Pages: 0
Release: 2023
Genre: Environmental impact analysis
ISBN:

Download State Route 116 - Stage Gulch Road Book in PDF, ePub and Kindle

"The California Department of Transportation (Caltrans) has prepared this Initial Study with Proposed Negative Declaration (IS/ND) for the State Route (SR) 116 - Stage Gulch Road/Lakeville Highway Intersection Safety Project (Project). Caltrans proposes two Build Alternatives to improve the safety of this intersection at post mile (PM) 39.3 on SR 116 in Sonoma County: Build Alternative 1 would install traffic signals, or Build Alternative 2 would construct a roundabout. Additional Project information is provided in Chapter 2. Caltrans is the lead agency under the California Environmental Quality Act (CEQA). This IS/ND describes why Caltrans proposes the Project, how the existing environment could be affected by the Project, potential environmental impacts, and the Project features and avoidance and minimization measures that would minimize Project impacts."--Page i.


State Route 116 at Mirabel Road Intersection Improvement Project in Forestville, Sonoma County; Post Mile 19.2 to 19.5

State Route 116 at Mirabel Road Intersection Improvement Project in Forestville, Sonoma County; Post Mile 19.2 to 19.5
Author: California. Department of Transportation
Publisher:
Total Pages:
Release: 2012
Genre: Environmental impact analysis
ISBN:

Download State Route 116 at Mirabel Road Intersection Improvement Project in Forestville, Sonoma County; Post Mile 19.2 to 19.5 Book in PDF, ePub and Kindle

The California Department of Transportation (Caltrans), in cooperation with the County of Sonoma proposes to improve the operation and safety of the existing T-intersection at State Route (SR) 116 and Mirabel Road in Forestville, Sonoma County.