Base Realignment And Closure Environmental Evaluation Brac Ee Fort Devens Massachusetts PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Base Realignment And Closure Environmental Evaluation Brac Ee Fort Devens Massachusetts PDF full book. Access full book title Base Realignment And Closure Environmental Evaluation Brac Ee Fort Devens Massachusetts.

Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts

Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts
Author:
Publisher:
Total Pages: 12
Release: 1995
Genre:
ISBN:

Download Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts Book in PDF, ePub and Kindle

Basewide environmental investigations were performed on Fort Devens from 1993 through 1995 in support of Base Realignment and Closure Environmental Evaluation activities. Seven basewide programs or Areas Requiring Environmental Evaluation (AREEs), were investigated during this time period. Supplemental sampling at select sites was recommended in the final reports for two AREEs, AREE 70 (Storm Sewer Evaluation) and AREE 69 (Past Spill Sites). This supplemental sampling event was performed in support of those recommendations.


Quality Assurance Project Plan, Supplement B - Base Realignment and Closure Environmental Evaluation, Fort Devens, Massachusetts, Revision 2

Quality Assurance Project Plan, Supplement B - Base Realignment and Closure Environmental Evaluation, Fort Devens, Massachusetts, Revision 2
Author:
Publisher:
Total Pages: 279
Release: 1994
Genre:
ISBN:

Download Quality Assurance Project Plan, Supplement B - Base Realignment and Closure Environmental Evaluation, Fort Devens, Massachusetts, Revision 2 Book in PDF, ePub and Kindle

The primary objective of this supplemental investigation for the BRAC EE is to evaluate four facility-wide Areas Requiring Environmental Evaluation (AREE) as outlined in the Enhanced Preliminary Assessment, Fort Devens, Massachusetts, April 1992. USATHAMA. The following AREEs will be evaluated: Maintenance and Waste Accumulation Areas; Transformers; Past Spill Site; and Previously Removed Underground Storage Tanks.


Storm Sewer System Evaluation (AREE 70) Report. Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts. Volume II, Revision 2, Appendix A.

Storm Sewer System Evaluation (AREE 70) Report. Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts. Volume II, Revision 2, Appendix A.
Author:
Publisher:
Total Pages: 657
Release: 1994
Genre:
ISBN:

Download Storm Sewer System Evaluation (AREE 70) Report. Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts. Volume II, Revision 2, Appendix A. Book in PDF, ePub and Kindle

Appendix A contains a list of methods and analyte CRLs and Laboratory and field QC sample results related to the evaluation of the Storm Sewer System at Fort Devens, Massachusetts.


Final Asbestos Report (AREE 65) Base Realignment and Closure Environmental Evaluation (BRAC EE), Part 2, Fort Devens, Massachusetts

Final Asbestos Report (AREE 65) Base Realignment and Closure Environmental Evaluation (BRAC EE), Part 2, Fort Devens, Massachusetts
Author:
Publisher:
Total Pages: 0
Release: 1995
Genre:
ISBN:

Download Final Asbestos Report (AREE 65) Base Realignment and Closure Environmental Evaluation (BRAC EE), Part 2, Fort Devens, Massachusetts Book in PDF, ePub and Kindle

As part of the Fort Devens Base Realignment and Closure Environmental Evaluation (BRAC EE) all structures on Fort Devens were inspected for asbestos. This evaluation was designated Areas Requiring Environmental Evaluation (AREE) 65. A total of 1,060 structures were surveyed consisting of 585 industrial and 475 non-industrial structures. Buildings of similar structure and construction date were grouped together. A total of 263 groups were identified. All buildings in each group were inspected to determine the presence of suspect asbestos-containing building materials (SACBM). Representative SACBM in each building group was then sampled to confirm the presence or absence of asbestos-containing materials (ACM). If sample results confirmed the presence of ACM, then all homogeneous materials in that group were determined to contain asbestos. After the buildings were inspected and sample results were known, an exposure risk value was determined using the USAEC Guidelines for Asbestos Hazard Assessments in U.S. Army Facilities. Exposure risks ranged from 'A' to 'F, with an 'A' designation recommending immediate action to mitigate the risk, and an 'F' designation recommending no immediate action. All buildings surveyed were incorporated into a database using the USAEC ACM Checklist. From this checklist, three reports were generated: a summary report; a cost to repair, remove, or replace ACBM report; and an exposure hazard risk report.


Version 3: Base Realignment and Closure (BRAC) Cleanup Plan: Fort Devens, Fort Devens, Massachusetts

Version 3: Base Realignment and Closure (BRAC) Cleanup Plan: Fort Devens, Fort Devens, Massachusetts
Author:
Publisher:
Total Pages: 392
Release: 1996
Genre:
ISBN:

Download Version 3: Base Realignment and Closure (BRAC) Cleanup Plan: Fort Devens, Fort Devens, Massachusetts Book in PDF, ePub and Kindle

This Base Realignment and Closure (BRAC) Cleanup Plan (BCP) describes the status, and management and response strategy related to Fort Devens ongoing environmental restoration and associated compliance programs. The scope of the BCP is based on requirements derived from the following laws: the Base Closure and Realignment Act; National Environmental Policy Act (NEPA); Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Community Environmental Response Facilitation Act (CERFA); Resource Conservation and Recovery Act (RCRA); and other applicable laws. The BCP is intended to be a dynamic planning document, developed by a BRAC Cleanup Team (BCT). The BCP will be updated regularly to reflect the current status and strategies of remedial actions and compliance programs. This document is the latest in a series of updates and represents conditions and strategies as of April 1996.


Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts
Author:
Publisher:
Total Pages: 394
Release: 1995
Genre:
ISBN:

Download Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts Book in PDF, ePub and Kindle

This Base Realignment and Closure (BRAC) Cleanup Plan (BCP) describes the status, management and response strategy, and action items related to Fort Devens ongoing environmental restoration and associated compliance programs. These programs support full restoration of the installation property, which is necessary to meet the requirements for property disposal and reuse activities associated with the closure of the installation. The scope of the BCP is based on requirements derived from the following laws: the BRAC Act; National Environmental Policy Act (NEPA); Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Community Environmental Response Facilitation Act (CERFA); Resource Conservation and Recovery Act (RCRA); and other applicable laws. The BCP is intended to be a dynamic planning document, developed by a BRAC Cleanup Team (BCT) consisting of U.S. Army, U.S. Environmental Protection Agency (USEPA), and state representatives. it was necessary to make certain assumptions and interpretations to develop the schedule and cost estimates provided in this plan. The BCP will be updated regularly to reflect the current status and strategies of remedial actions, compliance programs, and disposal and reuse planning. This document is the latest in a series of updates/modifications and represents conditions and strategies as of August 1995.


Military Base Closures

Military Base Closures
Author: Barry W. Holman
Publisher: DIANE Publishing
Total Pages: 42
Release: 2005-08
Genre: History
ISBN: 9780756748920

Download Military Base Closures Book in PDF, ePub and Kindle

Statement of Barry Holman, Dir., Def. Capability & Mgmt., Before the Defense Base Closure & Realign. Comm. The Defense Base Closure & Realign. Act of 1990 authorized a new round of base realign. & closures (BRAC) in 2005, the 5th such round in recent years but the first since 1995. The legislation requires the Sec. of Def. to submit his list of bases recommend. for closure & realign. to an indep. BRAC Comm. by 5/16/05. The Comm. is charged with reviewing these recommend. & submitting its report with recommend. to the Pres. for his acceptance or rejection of them in their entirety by 9/8/05. Subsequently, Congress has final action to accept or reject the recommend. in their entirety. Here is a review & report on the DoD process & recommend. Illus.