Application For A Certificate Of Public Convenience And Necessity Cpcn To Construct And Place In Utility Operation A 138 345 Kv Double Circuit Electrical Transmission Line Located In The Counties Of Outagamie And Waupaca Wisconsin PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Application For A Certificate Of Public Convenience And Necessity Cpcn To Construct And Place In Utility Operation A 138 345 Kv Double Circuit Electrical Transmission Line Located In The Counties Of Outagamie And Waupaca Wisconsin PDF full book. Access full book title Application For A Certificate Of Public Convenience And Necessity Cpcn To Construct And Place In Utility Operation A 138 345 Kv Double Circuit Electrical Transmission Line Located In The Counties Of Outagamie And Waupaca Wisconsin.

Application for a Certificate of Public Convenience and Necessity (CPCN) to Construct and Place in Utility Operation a 138/34.5 KV Double-circuit Electrical Transmission Line Located in the Counties of Outagamie and Waupaca, Wisconsin

Application for a Certificate of Public Convenience and Necessity (CPCN) to Construct and Place in Utility Operation a 138/34.5 KV Double-circuit Electrical Transmission Line Located in the Counties of Outagamie and Waupaca, Wisconsin
Author:
Publisher:
Total Pages:
Release: 1990
Genre: Electric lines
ISBN:

Download Application for a Certificate of Public Convenience and Necessity (CPCN) to Construct and Place in Utility Operation a 138/34.5 KV Double-circuit Electrical Transmission Line Located in the Counties of Outagamie and Waupaca, Wisconsin Book in PDF, ePub and Kindle


Application for Certificate of Public Convenience and Necessity ; Morgan - Werner West 345 KV Transmission Line ; Clintonville - Werner West 138 KV Transmission Line ; and Associated Substation Facilities

Application for Certificate of Public Convenience and Necessity ; Morgan - Werner West 345 KV Transmission Line ; Clintonville - Werner West 138 KV Transmission Line ; and Associated Substation Facilities
Author: American Transmission Company
Publisher:
Total Pages:
Release: 2003
Genre: Electric power distribution
ISBN:

Download Application for Certificate of Public Convenience and Necessity ; Morgan - Werner West 345 KV Transmission Line ; Clintonville - Werner West 138 KV Transmission Line ; and Associated Substation Facilities Book in PDF, ePub and Kindle


Joint Application for Certificate of Public Convenience and Necessity and Utility Permit Application (part 2), PSCW Docket No. 137-CE-147

Joint Application for Certificate of Public Convenience and Necessity and Utility Permit Application (part 2), PSCW Docket No. 137-CE-147
Author: American Transmission Company
Publisher:
Total Pages:
Release: 2007
Genre: Electric lines
ISBN:

Download Joint Application for Certificate of Public Convenience and Necessity and Utility Permit Application (part 2), PSCW Docket No. 137-CE-147 Book in PDF, ePub and Kindle

American Transmission Company application to the Public Service Commission of Wisconsin for authority to construct, own and operate a new electric transmission line in Dane County.


CapX2020 Certificate of Public Convenience and Necessity Application

CapX2020 Certificate of Public Convenience and Necessity Application
Author: Public Service Commission of Wisconsin
Publisher:
Total Pages:
Release: 2011
Genre: Electric lines
ISBN:

Download CapX2020 Certificate of Public Convenience and Necessity Application Book in PDF, ePub and Kindle

"...a printed copy of the application filed with the Public Service Commission of Wisconsin (Commission) for the Alma--La Crosse portion of the CapX 2020 Hampton--Rochester--La Crosse 345 kV Transmission Project (Application). It is being filed by Northern States Power Company (Xcel Energy), Dairyland Power Cooperative, and Wisconsin Public Power Inc. (the Applicants). This is the final version and replaces previous versions of the Application. The applicants seek authority to construct, own, and operate new transmission facilities in order to meet future local load-serving needs for La Crosse, Alma, Buffalo City, Fountain City, Arcadia, Galesville, Trempealeau, Holmen, Onalaska and surrounding areas. The Project would involve construction of a 345kV transmission line crossing of the Mississippi River at Alma, Wisconsin and would continue to a new substation near Holmen, Wisconsin. The project would be 40 to 55 miles long depending on the route chosen."--Letter of transmittal