Advanced Turbine Systems Program Conceptual Design And Product Development Quarterly Report August 1993 November 1994 PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Advanced Turbine Systems Program Conceptual Design And Product Development Quarterly Report August 1993 November 1994 PDF full book. Access full book title Advanced Turbine Systems Program Conceptual Design And Product Development Quarterly Report August 1993 November 1994.

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August 1993--November 1994

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August 1993--November 1994
Author:
Publisher:
Total Pages:
Release: 2005
Genre:
ISBN:

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August 1993--November 1994 Book in PDF, ePub and Kindle

This report discusses a series of heat balance programs were developed and reviewed in a Westinghouse Engineering Department meeting. The cycle formats were reviewed and candidate conditions and components selected for additional investigations, for the selection of the Natural Gas-fired Advanced Turbines Systems (GFATS).


Advanced Turbine Systems Program Conceptual Design and Product Development

Advanced Turbine Systems Program Conceptual Design and Product Development
Author:
Publisher:
Total Pages: 16
Release: 1995
Genre:
ISBN:

Download Advanced Turbine Systems Program Conceptual Design and Product Development Book in PDF, ePub and Kindle

This report describes progress made in the advanced turbine systems program conceptual design and product development. The topics of the report include selection of the Allison GFATS, castcool technology development for industrial engines test plan and schedule, code development and background gathering phase for the ultra low NOx combustion technology task, active turbine clearance task, and water vapor/air mixture cooling of turbine vanes task.


Advanced Turbine Systems Program--conceptual Design and Product Development. Quarterly Report, November 1994--January 1995

Advanced Turbine Systems Program--conceptual Design and Product Development. Quarterly Report, November 1994--January 1995
Author:
Publisher:
Total Pages: 14
Release: 1995
Genre:
ISBN:

Download Advanced Turbine Systems Program--conceptual Design and Product Development. Quarterly Report, November 1994--January 1995 Book in PDF, ePub and Kindle

Research continued in the design and development of advanced gas turbine systems. This report presents progress towards turbine blade development, diffuser development, combustion noise investigations, catalytic combustion development, and diagnostic probe development.


Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994
Author:
Publisher:
Total Pages: 78
Release: 1994
Genre:
ISBN:

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994 Book in PDF, ePub and Kindle

This Yearly Technical Progress Report covers the period August 3, 1993 through July 31, 1994 for Phase 2 of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE Contract No. DE-AC421-93MC30246. As allowed by the Contract (Part 3, Section J, Attachment B) this report is also intended to fulfill the requirements for a fourth quarterly report. The objective of Phase 2 of the ATS Program is to provide the conceptual design and product development plan for an ultra-high efficiency, environmentally superior and cost-competitive industrial gas turbine system to be commercialized in the year 2000. During the period covered by this report, Solar has completed three of eight program tasks and has submitted topical reports. These three tasks included a Project Plan submission of information required by NEPA, and the selection of a Gas-Fueled Advanced Turbine System (GFATS). In the latest of the three tasks, Solar's Engineering team identified an intercooled and recuperated (ICR) gas turbine as the eventual outcome of DOE's ATS program coupled with Solar's internal New Product Introduction (NPI) program. This machine, designated ''ATS50'' will operate at a thermal efficiency (turbine shaft power/fuel LHV) of 50 percent, will emit less than 10 parts per million of NOx and will reduce the cost of electricity by 10 percent. It will also demonstrate levels of reliability, availability, maintainability, and durability (RAMD) equal to or better than those of today's gas turbine systems. Current activity is concentrated in three of the remaining five tasks a Market Study, GFATS System Definition and Analysis, and the Design and Test of Critical Components.


Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August--October 1994

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August--October 1994
Author:
Publisher:
Total Pages: 6
Release: 1994
Genre:
ISBN:

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August--October 1994 Book in PDF, ePub and Kindle

This is a quarterly report on the Westinghouse Electric Corporation Advanced Turbine Systems Program--conceptual design and product development. The topics of the report include the management plan, National Energy Policy Act, selection of natural gas-fired advanced turbine systems, selection of coal-fired advanced turbine systems, market study, systems definition and analysis, design and test of critical components, and plans for the next reporting period.


Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, [August 3, 1993--October 31, 1993].

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, [August 3, 1993--October 31, 1993].
Author:
Publisher:
Total Pages: 27
Release: 1994
Genre:
ISBN:

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, [August 3, 1993--October 31, 1993]. Book in PDF, ePub and Kindle

This Quarterly Technical Progress Report covers the period August 3 through October 31, 1993, for Phase II of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE Contract No. DE-AC21-93MC30246. The objective of this program is to provide the conceptual design and product development plan for an industrial gas turbine system to operate at a thermal efficiency of 50 percent and developable to 60 percent. Solar's ATS Engine Design Team reviewed the intercooled and recuperated (ICR) gas turbine concept defined in the Program proposal, validated certain assumptions associated therewith, and began the process of actualizing this concept in terms of achievable turbomachinery components. Given the probable use of a free power turbine arrangement, both 1-spool and 2-spool compressor arrangements were examined with both fixed and variable turbine geometry. Off-design performance, both part-load and full-load over a range of inlet air temperatures, was examined. During this period certain simplifying assumptions were made regarding the amount of cycle air extracted for use in turbine cooling and the distribution of its return to the cycle. The exact influence of turbine cooling air extraction on cycle performance (thermal efficiency) will be highly dependent upon turbine airfoil material selection, its life/temperature capabilities, etc. Thus, cycle performance will be subject to some degree of change as the design progresses. Even now, improvements made to the cycle performance model will result in variation in presented results. As a general rule, later results will always supersede earlier results when there is an apparent conflict.


Advanced Turbine Systems Program

Advanced Turbine Systems Program
Author:
Publisher:
Total Pages: 12
Release: 1996
Genre:
ISBN:

Download Advanced Turbine Systems Program Book in PDF, ePub and Kindle

Several tasks were completed. Design and test of critical components are discussed. Plans for the next reporting period are outlined.