Sustaining Us Nuclear Submarine Design Capabilities PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Sustaining Us Nuclear Submarine Design Capabilities PDF full book. Access full book title Sustaining Us Nuclear Submarine Design Capabilities.

Sustaining U.S. Nuclear Submarine Design Capabilities

Sustaining U.S. Nuclear Submarine Design Capabilities
Author: John Frederic Schank
Publisher: Rand Corporation
Total Pages: 235
Release: 2007
Genre: Business & Economics
ISBN: 0833041606

Download Sustaining U.S. Nuclear Submarine Design Capabilities Book in PDF, ePub and Kindle

For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret.


Sustaining U.S. Nuclear Submarine Design Capabilities

Sustaining U.S. Nuclear Submarine Design Capabilities
Author: John Frederic Schank
Publisher: Rand Corporation
Total Pages: 56
Release: 2007
Genre: Business & Economics
ISBN:

Download Sustaining U.S. Nuclear Submarine Design Capabilities Book in PDF, ePub and Kindle

The U.S. submarine eet currently numbers more than 50 fast attack submarines (SSNs) and 18 submarines built to launch ballistic missiles (SSBNs). All are nuclear powered to maximize the duration and speed of underwater operations. While the submarine eet has been decreasing in size since the end of the Cold War, it is anticipated that the U.S. Navy will sustain a force of several dozen boats into the foreseeable future. Submarines are almost continually being built to replace older ones that must be retired. As is the case with surface ships, submarines are built in classes sets of boats constructed to a common design. Designing a new class of nuclear submarines is a very large and complex endeavor, lasting 15 years or longer and requiring 15,000 to 20,000 man-years at the prime shipyard contractor alone.


Sustaining U.S. Nuclear Submarine Design Capabilities

Sustaining U.S. Nuclear Submarine Design Capabilities
Author:
Publisher:
Total Pages: 47
Release: 2007
Genre:
ISBN:

Download Sustaining U.S. Nuclear Submarine Design Capabilities Book in PDF, ePub and Kindle

The U.S. submarine eet currently numbers more than 50 fast attack submarines (SSNs) and 18 submarines built to launch ballistic missiles (SSBNs). All are nuclear powered to maximize the duration and speed of underwater operations. While the submarine eet has been decreasing in size since the end of the Cold War, it is anticipated that the U.S. Navy will sustain a force of several dozen boats into the foreseeable future. Submarines are almost continually being built to replace older ones that must be retired. As is the case with surface ships, submarines are built in classes sets of boats constructed to a common design. Designing a new class of nuclear submarines is a very large and complex endeavor, lasting 15 years or longer and requiring 15,000 to 20,000 man-years at the prime shipyard contractor alone.


Sustaining U.S. Nuclear Submarine Design Capabilities

Sustaining U.S. Nuclear Submarine Design Capabilities
Author: John F. Schank
Publisher: Rand Corporation
Total Pages: 235
Release: 2007-06-14
Genre: Business & Economics
ISBN: 0833042769

Download Sustaining U.S. Nuclear Submarine Design Capabilities Book in PDF, ePub and Kindle

Nuclear submarine design resources at the shipyards, their suppliers, and the Navy may erode for lack of demand. Analysis of alternative workforce and workload management options suggests that the U.S. Navy should stretch out the design of the next submarine class and start it early or sustain design resources above the current demand, so that the next class may be designed on time, on budget, and with low risk.


Sustaining the Ability to Design Nuclear Submarines

Sustaining the Ability to Design Nuclear Submarines
Author:
Publisher:
Total Pages: 0
Release: 2007
Genre:
ISBN:

Download Sustaining the Ability to Design Nuclear Submarines Book in PDF, ePub and Kindle

This research brief summarizes an analysis of workforce and workload management options to suggest ways to constrain the cost, schedule, and risk involved in the design of the U.S. Navy's next nuclear submarine class.


Sustaining the Ability to Design Nuclear Submarine

Sustaining the Ability to Design Nuclear Submarine
Author: John Frederic Schank
Publisher:
Total Pages:
Release: 2007
Genre:
ISBN:

Download Sustaining the Ability to Design Nuclear Submarine Book in PDF, ePub and Kindle

This research brief summarizes an analysis of workforce and workload management options to suggest ways to constrain the cost, schedule, and risk involved in the design of the U.S. Navy's next nuclear submarine class.


The United Kingdom's Nuclear Submarine Industrial Base: Sustaining design and production resources

The United Kingdom's Nuclear Submarine Industrial Base: Sustaining design and production resources
Author: John Frederic Schank
Publisher: Rand Corporation
Total Pages: 98
Release: 2005
Genre: History
ISBN: 9780833037978

Download The United Kingdom's Nuclear Submarine Industrial Base: Sustaining design and production resources Book in PDF, ePub and Kindle

The complexity and uniqueness of a nuclear submarine require special skills, facilities, and oversight not supported by other shipbuilding programmes. In fact, a single shipyard, Barrow-in-Furness, designs and builds the United Kingdom's nuclear submarines, and many of the vendors that support submarine construction are sole-source providers. With such specialisation, in addition to a limited design and production demand, there is concern about whether the submarine industrial base can maintain its viability into the future. This report seeks to determine what actions should be taken to maintain nuclear submarine design capabilities and how nuclear submarine production should be scheduled for efficient use of the industrial base. Based on their findings, the authors recommend that the Ministry of Defence determine the scheduling of construction for future submarine contracts as soon as possible; plan to retain a design core of designers, engineers, and draughtsmen during periods of reduced demand; and take steps towards collaboration with other countries.


Nuclear Submarines of Advanced Design

Nuclear Submarines of Advanced Design
Author: United States. Congress. Joint Committee on Atomic Energy
Publisher:
Total Pages: 264
Release: 1968
Genre: Nuclear submarines
ISBN:

Download Nuclear Submarines of Advanced Design Book in PDF, ePub and Kindle

Classified material has been deleted.


The Nuclear Submarine Force--past, Present and Future

The Nuclear Submarine Force--past, Present and Future
Author: United States. Congress. House. Committee on Armed Services. Projection Forces Subcommittee
Publisher:
Total Pages: 98
Release: 2006
Genre: Government publications
ISBN:

Download The Nuclear Submarine Force--past, Present and Future Book in PDF, ePub and Kindle


Sustaining Key Skills in the UK Naval Industry

Sustaining Key Skills in the UK Naval Industry
Author: Hans Pung
Publisher: RAND Corporation
Total Pages: 166
Release: 2008
Genre: Business & Economics
ISBN:

Download Sustaining Key Skills in the UK Naval Industry Book in PDF, ePub and Kindle

"To preserve its ability to design, build, and support complex warships and submarines, the UK Ministry of Defence (MOD) will need to preserve and sustain several key technical skills in the maritime domain, particularly those of designers and engineers at various stages of surface ship and submarine acquisition and support. Its current naval acquisition programme, comprising several classes of vessels (such as the Astute-class attack submarine and the Future Aircraft Carrier), has brought forward questions regarding the MOD's ability to design, build, and support the intended fleet size. Building on prior RAND research, this monograph explores in greater detail the need for and retention of specific technical skills in the UK's naval industrial base. It investigates the relationship between the demand created by the MOD's surface ship and submarine acquisition programme and the technical workforce needed to design, build, and support those war vessels. The results reveal that, although the MOD has taken into account the need for these skills, its future naval programme likely will have to be modified or augmented to sustain these technical skills in the long term. In particular, the MOD needs to nurture design and engineering skills to bridge current and future gaps as its naval acquisition programme moves forward."--Publisher's website.