Macro Corridor Study PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Macro Corridor Study PDF full book. Access full book title Macro Corridor Study.
Author | : |
Publisher | : |
Total Pages | : 272 |
Release | : 1984 |
Genre | : |
ISBN | : |
Download 345 KV Transmission Line Construction, Flint Creek to Morgan, Macro-corridor Study Book in PDF, ePub and Kindle
Author | : Four Corners Environmental Research Institute |
Publisher | : |
Total Pages | : |
Release | : 1981 |
Genre | : Overhead electric lines |
ISBN | : |
Download Macro Corridor Study Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 128 |
Release | : 1994 |
Genre | : |
ISBN | : |
Download Comanche to Walsenburg 230-kV Transmission Line Project Macro Corridor Study Book in PDF, ePub and Kindle
Author | : United States. Rural Utilities Service |
Publisher | : |
Total Pages | : 32 |
Release | : 2009 |
Genre | : Electric lines |
ISBN | : |
Download Macro-corridor Study Book in PDF, ePub and Kindle
Author | : Mangi Environmental Group, Inc |
Publisher | : |
Total Pages | : 80 |
Release | : 2005 |
Genre | : Electric power distribution |
ISBN | : |
Download Macro-corridor Study Report Book in PDF, ePub and Kindle
"One project under consideration by RUS is loan funding for the construction of an electric power transmission line by the Central Electric Power Cooperative Inc (CEPCI) from existing power sources to a new Berkely Electric substation near the town of McClellanville, SC. The need for additional reliable power and alrenative means to provide that power are discussed in a separate accompanying report - the Alternative Evaluation Study... This macro-corridor study was conducted to determine what potential transmission line routing options were available for the McClellanville line, and in general terms, how they might be planned to avoid potential environmental, social, cultural, and economic effects. The results and findings of this report will serve as the foundation upon which a more detailed NEPA analysis will be conducted. For this study, three originating points from the transmission line - Charity, Jamestown, and Winyah/Belle Isle, and a single destination point - a proposed substation in McClellanville, were considered." - pg. 1-2.
Author | : |
Publisher | : |
Total Pages | : 0 |
Release | : 1994 |
Genre | : |
ISBN | : |
Download Comanche to Walsenburg 230-kV transmission line project macro corridor study Book in PDF, ePub and Kindle
Author | : Basin Electric Power Cooperative |
Publisher | : |
Total Pages | : 188 |
Release | : 1980 |
Genre | : Electric lines |
ISBN | : |
Download Macro-corridor Study and Alternative Evaluation for the Proposed 345 KV Transmission Line from the Antelope Valley Station to the Charlie Creek Substation Book in PDF, ePub and Kindle
Author | : |
Publisher | : |
Total Pages | : 0 |
Release | : 1984 |
Genre | : |
ISBN | : |
Download 345 kV transmission line construction, Flint Creek to Morgan, Macro-corridor study Book in PDF, ePub and Kindle
Author | : Cambridge Systematics |
Publisher | : Transportation Research Board |
Total Pages | : 169 |
Release | : 2008 |
Genre | : Freight and freightage |
ISBN | : 0309099242 |
Download Forecasting Statewide Freight Toolkit Book in PDF, ePub and Kindle
Federal planning legislation and regulations now mandate that state departments of transportation and metropolitan planning organizations consider the needs of freight when planning and programming transportation investments. While there are standard techniques used to forecast the movement of people, less attention has been paid to forecasting freight movements, and there are consequently fewer standardized techniques that state and local agencies can adapt to their local situation. This Toolkit is designed to provide transportation planners with the information they need to prepare forecasts of freight transportation by highlighting techniques successfully developed by state agencies across the country.
Author | : United States. Rural Development |
Publisher | : |
Total Pages | : |
Release | : 2009* |
Genre | : Electric lines |
ISBN | : |
Download Macro Corridor Study Book in PDF, ePub and Kindle
Dairyland Power Cooperative, Northern States Power Company of Minnesota and Wisconsin (Xcel Energy), Southern Minnesota Municipal Power Agency, Rochester Public Utilities, WPPI Energy propose to construct a 345 kilovolt (kV) line project between Hampton, Minnesota and La Crosse, Wisconsin. The project is a segment of the larger CapX2020 project.