Lower Snake River Juvenile Salmon Migration Feasibility Study Interim Status Report System Configuration Study Phase Ii PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Lower Snake River Juvenile Salmon Migration Feasibility Study Interim Status Report System Configuration Study Phase Ii PDF full book. Access full book title Lower Snake River Juvenile Salmon Migration Feasibility Study Interim Status Report System Configuration Study Phase Ii.

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M
Author:
Publisher:
Total Pages: 393
Release: 2002-02
Genre:
ISBN: 9781423505174

Download Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix L: Lower Snake River Mitigation History and Status. Appendix M Book in PDF, ePub and Kindle

This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of reclamation (BOR) as cooperating agencies, analyzed four alternative to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting that alternative.