Final Work Plan For The Remediation Investigations And Feasibility Studies Of The Helicopter Hangar Area And The Fire Training Area At Fort George G Meade Maryland PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Final Work Plan For The Remediation Investigations And Feasibility Studies Of The Helicopter Hangar Area And The Fire Training Area At Fort George G Meade Maryland PDF full book. Access full book title Final Work Plan For The Remediation Investigations And Feasibility Studies Of The Helicopter Hangar Area And The Fire Training Area At Fort George G Meade Maryland.

Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Author:
Publisher:
Total Pages: 70
Release: 1995
Genre:
ISBN:

Download Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland Book in PDF, ePub and Kindle

This Work Plan has been prepared to address the Remedial Investigation/ Feasibility Study (RI/FS) activities being conducted at the Helicopter Hangar Area (HHA) and the Fire Training Area (FTA) at Fort George G. Meade (FGGM), Maryland. It has been prepared for the U.S. Army Environmental Center (USAEC) to fulfill the requirements of deliverable ELIN A004 under Delivery Task Orders 0002 and 0003 of Contract DAAA15-93-D-0010. This Work Plan has been developed in accordance with Geotechnical Requirements for Drilling Monitor Wells Data Acquisition and Reports (USATHAMA, 1987); USATHAMA Quality Assurance Plan (USATHAMA, 1990); Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (USEPA, 1988); Risk Assessment Guidance for Superfund. Volumes I and II (USEPA, 1989); Community Relations in Superfund: A Handbook (USEPA, 1988) and Superfund Public Health Evaluation Manual (USEPA, 1986).


Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Author:
Publisher:
Total Pages: 68
Release: 1995
Genre:
ISBN:

Download Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland Book in PDF, ePub and Kindle

The purpose of this investigation is to conduct a remedial investigation/feasibility study at the HHA and FTA sites at Fort Meade. As part of the analyses, data gaps will be identified. Previous studies have been conducted by Arthur D. Little, Inc., and EA engineering, Science and Technology, Inc. The RI/FS process is designed to collect sufficient data of demonstrable quality, which can then be used to assess potential risks to human health and the environment, develop/evaluate remedial alternatives, and select a preferred remedial action. In general, data obtained during the RI phase is used to evaluate the nature, extent, and migration of contaminants at sites that are known or believed to have been adversely impacted by past hazardous waste or hazardous materials handling practices. The FS phase evaluates potential remedial action with regard to effectiveness, risk reduction or mitigation, implementability, and cost.


Final Quality Assurance Plan for the Remedial Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Final Quality Assurance Plan for the Remedial Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland
Author:
Publisher:
Total Pages: 73
Release: 1995
Genre:
ISBN:

Download Final Quality Assurance Plan for the Remedial Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland Book in PDF, ePub and Kindle

The Quality Assurance (QA) reviews under this task order for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA), are systematic evaluations of four aspects of the Helicopter Hangar Area (HIjA) Remedial Investigations and Feasibility Studies (RI/F S) at Fort George G. Meade, Maryland (FGGM) The four aspects are: (1) overall project activities and documents; (2) field/geotechnical activities; (3) laboratory analysis activities; and (4) data files and packages. The overall project and field Quality Assurance reviews will be undertaken by the Analysas project QA officer or his designee. The laboratory Quality Assurance reviews will be accomplished by our subcontracted laboratory, PACE Environmental Laboratories (PACE), with QA oversight provided by the Analysas project QA officer or his designee. The Analysas project QA officer will also review USAEC data packages from PACE.


Site Health and Safety Plan for the Helicopter Hangar Area, Fire Training Area, and Ordnance Demolition Area at Fort George G. Meade, Maryland

Site Health and Safety Plan for the Helicopter Hangar Area, Fire Training Area, and Ordnance Demolition Area at Fort George G. Meade, Maryland
Author:
Publisher:
Total Pages: 66
Release: 1995
Genre:
ISBN:

Download Site Health and Safety Plan for the Helicopter Hangar Area, Fire Training Area, and Ordnance Demolition Area at Fort George G. Meade, Maryland Book in PDF, ePub and Kindle

The U.S. Army Environmental Center (USAEC) policy is to provide a safe and healthfiil workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Fort George G. Meade Fire Training Area (FTA), Helicopter Hangar Area (HHA), and Ordnance Demolition Area have an overall plan and consistent proactive approach to health and safety issues.


Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas

Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas
Author:
Publisher:
Total Pages: 76
Release: 1989
Genre:
ISBN:

Download Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas Book in PDF, ePub and Kindle

Work assignments under this contract will include a Preliminary Assessment/Site Investigation at the former Gaithersburg NIKE Control and Launch Areas and a Remedial Investigation at the Fort Meade Landfill and other technical actions to establish the basis for development and evaluation of remedial alternatives. The program requires flexibility in organizing a team of technical personnel and technical resources to meet installation-specific needs, concurrent with employing preapproved field procedures, sampling techniques, and analytical methods to accomplish the assigned effort. At any given time during the period of performance, contamination assessments, sampling and analysis, geo- physical or aquifer testing, and preliminary risk assessments may be in various stages of progress. The effective program organization will accommodate these requirements for both flexibility and consistency while maintaining a manageable degree of control over all activities. Figure 1-1 illustrates the proposed organization for accomplishment of this effort. The core of the technical organization is the Project Manager and the assigned Project Team. Additional individuals can be made available if warranted. The Project Manager assigned to the project has current USATHAMA task management experience and will act as a direct line of technical communication to the COR with a secondary, backup line of communication through the Program Manager.


Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan

Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan
Author:
Publisher:
Total Pages: 78
Release: 1995
Genre:
ISBN:

Download Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan Book in PDF, ePub and Kindle

The purpose of this document is to establish procedures and protocols that will be followed to protect on-site personnel, visitors, and the public from physical harm and exposure to hazardous material or wastes during the remedial investigationlfeasibility study of the Defense Reutilization and Marketing Office (DRMO) Site (formerly referred to as the Defense Property Disposal Organization (DPDO) Site) on Fort George 0. Meade near Laurel, Maryland. Engineering Technologies Associates, Inc. (ETA) and subcontractor personnel involved in remedial investigations at sites where hazardous substances are present may potentially be exposed to a variety of chemical, physical, environmental, biological, and ergonomic hazards, including: * Inhalation of toxic airborne contaminants; * Skin contact with contaminated soil and water; * Presence of flammable/combustible vapors; * Explosives or unexploded ordnance; * Oxygen-deficient atmospheres; * Heat stress due to protective clothing and environmental conditions; * Cold stress due to environmental conditions; * Etiologic agents and biological hazards; and * Physical hazards associated with field operations (e.g., working near heavy equipment, slips, trips, falls, etc.).


Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2

Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2
Author:
Publisher:
Total Pages: 189
Release: 1993
Genre:
ISBN:

Download Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2 Book in PDF, ePub and Kindle

This Quality Control Plan has been prepared to address the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) Addendum activities and a Change Order to Delivery Order No. 0009 dated July 15, 1993, at the Fort George G. Meade (FGGM). It has been prepared for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA), to fulfill the requirement of deliverable ELIN A004 under Task Order 0009 of TEPS contract DAAA15-9l-D-00l6. It has been developed in accordance with the USATHAMA Quality Assurance Program, USATHAMA Geotechnical Requirements, and Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.


Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12

Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12
Author:
Publisher:
Total Pages: 1148
Release: 1993
Genre:
ISBN:

Download Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12 Book in PDF, ePub and Kindle

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).